Foothill-South is the proposed extension of the 241 Toll Road
south to the I-5 near San Clemente. It is the final segment of the
Transportation Corridor Agencies' (TCA) 67-mile public toll road network.
Foothill-South is a general term referring to the toll road extension,
although different alignments, or routes of the road, were studied.
In addition, three non-toll road alternatives were studied.
An Environmental Impact Statement (EIS)/Subsequent Environmental
Impact Report (SEIR) are documents prepared by planning agencies
to satisfy state and federal environmental laws. The purpose of
the Draft EIS/SEIR was to analyze all potential environmental, socio-economic,
and traffic impacts of 10 project alternatives under various scenarios
for housing development and build out of the Orange County’s
Master Plan of Arterial Highways.
There is no preferred alternative identified in the Draft
EIS/SEIR. The purpose of the document was to scientifically evaluate
all the project alternatives equally and disclose the traffic benefits
and potential environmental impacts of all of the alternatives.
Because the 90-day comment period officially ended on August
6, 2004, any comments received after that date will not be a part
of the formal public record for the environmental document; however,
the public can still comment on the project by contacting local
representatives on the Foothill/Eastern
Board of Directors. Board
meetings, held every second Thursday of the month, are open
to the public. You may also be added to our Foothill-South mailing
list to receive updates about the status of the project, including
information about future public hearings before the Foothill/Eastern
Board of Directors selects a locally preferred alternative and certifies
the final Subsequent Environmental Impact Report (SEIR).
A number of steps must occur before construction can begin.
But assuming key decisions including selection of an alignment are
made, permits are secured, and financing is obtained in 2006, construction
could begin in 2007, and open to traffic in 2009.
The
Foothill/Eastern Board of Directors, which is comprised of local
elected officials that are appointed from cities and jurisdictions
along the 241 Toll Road (such as San Clemente, San Juan Capistrano,
Dana Point, Mission Viejo, Lake Forest, Yorba Linda, and others),
is scheduled to make a decision in the first half of 2005 on the
locally preferred route. The Federal Highway Administration (FHWA)
is presently working with TCA and other federal resource agencies
such as the Army Corps of Engineers, the U.S. Fish and Wildlife
Service, and the Environmental Protection Agency to decide the best
possible route. In addition to the Foothill/Eastern Board's decision,
the FHWA must issue a Record of Decision on a preferred alignment
in the second half of 2005. If a toll road alternative is selected,
TCA will then obtain permits to begin construction. Assuming these
key decisions are made, permits are secured, and financing is obtained
in 2005-2006, construction could begin in 2006-2007, and open to
traffic in 2008-2009.
Two sets of decisions are required to select a preferred route because,
as with other major highway infrastructure projects, the project
must be evaluated according to state and federal environmental regulatory
laws. For Foothill-South, the Foothill/Eastern Transportation Corridor
Agency is the lead agency to complete the Subsequent Environmental
Impact Report (SEIR) as required by the state California Environmental
Quality Act; while the Federal Highway Administration (FHWA) is
the lead agency to complete the Environmental Impact Statement (EIS)
under the federal National Environmental Policy Act.
A 3,200-page EIS/SEIR was prepared to jointly satisfy both processes.
The purpose of the document was to scientifically evaluate all the
project alternatives equally and disclose the traffic benefits and
potential environmental impacts of all of the alternatives. Both
the Foothill/Eastern Agency and the FHWA must certify their respective
environmental documents and select a preferred alternative. Because
TCA has been working collaboratively with the federal resource agencies
through the environmental review process, the FHWA and TCA decision
on a locally preferred route should be the same.
The estimated cost of construction for the toll-road project
alternatives ranges from $513 million to $1.1 billion. The figures
are based on preliminary engineers estimates and do not reflect
competitive pricing.
A combination of funding sources will be used to finance
Foothill-South. As with the existing toll road system, Foothill-South
will be financed primarily through the sale of toll revenue bonds
in the municipal bond market. It is anticipated that the Foothill/Eastern
Agency would sell bonds after the necessary environmental approvals
and permits are secured. Toll revenue collected from the 241, 261,
and 133 Toll Roads will be pledged to repay the Foothill-South debt.
Once the debt is repaid, the roads are planned to become freeways.
To date, the Foothill/Eastern Agency has set aside approximately
$80 million from excess revenue to help offset Foothill-South construction
costs. Each year, this balance grows as "cash on hand" to create
a down payment that reduces the amount of toll revenue bonds that
the Agency will need to issue to fund construction. While some federal
transportation funds will be used to help offset the amount of bonds
issued, bond financing will be the primary source of construction
funding for Foothill-South.
All comments received between May 7-August 6, 2004 will be
included in the official public record which will be reviewed by
local and federal decision makers who will select a preferred project
alternative. TCA will not respond to people individually, but all
questions and comments will be responded to and will be included
in the Final EIS/SEIR "Response to Comments" document.
In November 2000, TCA along with the Federal Highway Administration,
Environmental Protection Agency, Army Corps of Engineers, US Fish
and Wildlife Service, Caltrans, and Marine Corps Camp Pendleton
(known as the "Collaborative") agreed on six main project alternatives
to be evaluated in the EIR/SEIR. These alternatives included three
toll-road alignments, or routes, and three non-toll road alternatives
- the widening of the I-5 Freeway, the widening of major arterial
roads, and a no project alternative. Selecting these project alternatives
to be studied was a required step under a federal environmental
process defined in 1994 (NEPA/Section 404 MOU). As the EIS/SEIR
was being developed, the toll road alignments were refined to avoid
sensitive areas and/or minimize potential environmental impacts.
These refinements include two routes that end at Avenida Pico or
Avenida Vista Hermosa in San Clemente.
You may view additional Foothill-South information online,
or contact our Community Relations
Representative Jeff Bott at (949) 754-3458. In addition, The
Toll Roads Information Center (Hours: Tues.-Fri. 9:30 a.m. to 5
p.m. / Sat. 10:00 a.m. to 4 p.m.) in San Clemente has detailed aerial
maps and 3-D models of the proposed alignments. It is located at
209 Avenida Del Mar, Suite 201, (near Ole Vista and Avenida Del
Mar) (949) 366-4941.
|